enphase IQ7 Installation And Operation Manual page 16

Microinverters for ac module applications
Table of Contents

Advertisement

C. Slide the hex nut onto the cable.
D. Insert the cable into the terminator body so that each of the two wires land on opposite
sides of the internal separator. There is a grommet inside the hex nut that should remain in
place.
E. Insert a screwdriver into the slot on the top of the terminator to hold it in place and torque
the nut to 7 N m.
F. Hold the terminator body stationary with the screwdriver and turn only the hex nut to
prevent conductors from twisting out of the separator.
NOTE: Turn only the hex nut to prevent conductors from twisting out of the separator.
G. Attach the terminated cable end to the PV racking with a cable clip or tie wrap so that the
cable and terminator do not touch the roof.
WARNING: The terminator cannot be re-used. If you unscrew the nut, you must discard the
terminator.
16
© 2023 Enphase Energy Inc. All rights reserved.
IQ Microinverters for AC Module applications
June 2023
USM-00001-1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq7+Iq7aIq7x

Table of Contents