7
|
Unit installation
Installer reference guide
82
4×
2 Remove the lower part of the discharge grille.
4×
3 Rotate the lower part of the discharge grille.
4 Align the ball stud and hook on the grille with their counterparts on the unit.
5 Insert the hook.
6 Insert the ball stud.
EPRA08~12EAV3+W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1B – 2022.07