Daikin EPRA10EAV3 Installer's Reference Manual page 118

Table of Contents

Advertisement

9
|
Electrical installation
Installer reference guide
118
If the switch box is lowered in service position while the electrical installation is
done, additional cable length has to be taken into account adequately. The cable
routing in normal position is longer than in service position.
All cables which will be connected to the switch box of the ECH
strain relief.
O must be fixed by
2
EPRA08~12EAV3+W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1B – 2022.07

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents