Draft Tower Installation - True TBR Series Installation Manual

Hide thumbs Also See for TBR Series:
Table of Contents

Advertisement

Cabinet Setup (cont.)

Draft Tower Installation

Procedure
1. Position the rubber washer (see fig. 1) over the mounting holes
in the cabinet countertop.
2. Thread the beer line connector (see fig. 2) to the draft arm.
See fig. 3.
3. Run the beer line through the hole and into the cabinet.
See fig. 4.
4. With the provided hardware, install the draft arm. See figs. 5
and 6.
5. Remove the top of the draft arm. See fig. 7a.
6. Insert the air hose [1" (25.4mm) plastic tube] into the draft arm.
See fig. 7b.
NOTE: Take care to not disturb the insulation.
7. Hook the air hose clip to the insulating sleeve at the top of the
draft arm. See fig. 8.
NOTE: The clip ensures the chill hose, which keeps the beer
faucet cold, remains correctly positioned.
8. Replace the top of the draft arm.
Fig. 5.
Ensure the rubber gasket is
between the countertop and draft
arm.
Fig. 8.
Hang the chill hose clip over the beer line.
Page 10 of 40
TBR | TDR SERIES
Fig. 6.
Thread the handle onto the
beer draft arm.
Fig. 1.
Draft arm components; draft
arm not shown.
Fig. 3.
Attach the beer line connector
to the draft arm.
A
Fig. 7.
Route the air hose through the draft tower from below.
03/2/2023
www.truemfg.com
Fig. 2.
Be sure to insert the O-ring into
the beer line connector.
Fig. 4.
Run the line into the cabinet.
B
P#803294
TEC_TM_043 | REV. F | EN

Advertisement

Table of Contents
loading

Table of Contents