Notifier INSPIRE E10/E15 Control Panels - Installation instructions
Commissioning
The commissioning process require each Notifier INSPIRE E10/E15 Control panel based system to be powered
up to an operational state ready for configuration, refer to the Commissioning instructions manual (HOP-138-
8EN) for detials on first time commissioning.
75