Description of this Upgrade
Step 19. Boot the Instrument
Step 19. Boot the Instrument
1. Power up the instrument and allow it to run for a couple of minutes to
2. If the instrument stabilizes without errors, continue to the next step.
Else, if the unit still has initialization errors which look like problems that
cannot be resolved, contact the Keysight Technologies. Refer to
Assistance from Keysight" on page
Step 20. Reinstall the Inner and Outer Covers
For instructions, click the Chapter 7 bookmark "Removing the Covers" in the
PDF Service Guide
IMPORTANT! If you have an instrument with a serial number prefix <5200
you will need to replace the inner cover (N5221-00001). Refer to the
Service Guide's "Removing and Replacing the Fans" section and to
on page
Step 21. Verify the PNA Analyzer Program is Running with the
Correct Options
If if the option(s) have not been enabled or if your older options have not
been removed, contact Keysight Technologies. Refer to
Assistance from Keysight" on page
1. Start the Network Analyzer program.
2. Once the Network Analyzer program is running:
3. After successful installation of all upgrades, some features require some
Installation Note N5222-90133
stabilize. This may require several reboots.
1
.
9.
— Press Help > About NA and verify that the correct options are listed
in the PNA application.
adjustments to ensure the instrument meets its specified performance.
Refer to the following Web site
https://support.keysight.com/s/.
1. See
"Downloading the Online PNA Service Guide" on page
4.
"Getting
4.
7.
"Getting
Table
47