Berbel Skyline Curve Operating And Installation Instructions page 13

Island hood
Table of Contents

Advertisement

Installation
☞ Insert the bolt anchors into the holes.
☞ Ensure that the bolt anchors are tight in the holes.
6
☞ Screw the nuts and the washers onto the bolt anchors in
the position of the lock holes.
☞ Ensure that there is at least a 6 mm gap between the
ceiling and the top edge of the washers.
☞ Push the ceiling mounting plate over the nuts in the lock
holes.
☞ Twist the ceiling mounting plate so that it is held by the
nuts.
☞ Ensure that the ceiling mounting plate is hanging
securely.
6006241_0 – 30.05.2022
☞ Screw the nuts and the washers onto the bolt anchors in
the slots.
☞ Ensure that the ceiling mounting plate is aligned parallel
to the hob's front edge.
☞ Tighten the nuts cross-wise using the spanner.
☞ Ensure that all nuts are fully tightened.
The ceiling mounting plate is hanging securely and aligned
correctly on the ceiling.
D WARNING!
Risk of death due to electric shock!
Touching live parts can cause an electric shock, burns or
death.
☞ Ensure that the power supply is switched off and remains
so.
Variant without ceiling effect lighting
☞ Observe the voltage specifications on the ratings plate.
☞ Connect the Wieland socket to the ceiling connection
plate.
☞ Connect the Wieland socket to the power supply
provided by the customer.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Skyline edgeSkyline edge lightBih 95 skcBih 95 skeBih 95 ske lightBih 115 skc ... Show all

Table of Contents