Configuration of Instrumentation System
Duplex Initialization Start
(Power to PLC turned ON, cold or hot start command executed, initialize
switch turned ON, Inner Board restarted, or error log cleared.)
CPU Unit's cycle time
CS1D CPU Unit
Operation
Extension of 44 ms max.
start
CS1D-CPU@@P
Process-control CPU Unit
Active side
Operation
start
Standby side
Operation
standby
Note: Duplex initialization at the start of CPU Unit operation or when data is transferred to the CPU Unit
will consist of b) only; a) will not be included.
44
Duplex Initialization Time (152 s max.)
a) Cycles Other Than the Last CPU Unit Cycle
150 s max.
Loop Controller component's operation cycle
Extension of 44-ms max.
Standby
Note
The time required for duplex initialization depends on the type of operation
being performed, as shown in the following table.
Operations for
CPU Unit
Operations for
Loop Controller
component
6. Evaluation of External I/O Response Cycle (Dependent on CPU Unit's
Cycle Time)
The operating speed (operation cycle) itself of each function block on the
Loop Controller is not related to the CPU Unit's cycle time. However, as the
CPU Unit's I/O memory is accessed during data exchange, for example,
between Analog I/O Units and the Basic I/O Unit, the timing of data ex-
change is greatly influenced by the CPU Unit's cycle time.
The external analog I/O response cycle (equivalent to the I/O response cy-
cle on a general controller) when the Loop Controller is configured as part
(See note.)
b) Last CPU Unit Cycle
Approx. 2.1 s max.
Extension of
approx. 2 s max.
Extension of
approx. 2 s max.
Operation start
a) Cycles other than the last CPU Unit cycle
:
Extension of 44 ms max.
b) Last CPU Unit cycle
:
Extension of approx. 2 s max.
Operation
Turning ON power to PLC
Pressing initialization switch on
Duplex Unit
Starting CPU Unit operation
Transferring data to CPU Unit
Sending a cold or hot start com-
mand to the Loop Controller
Restarting the Loop Controller
component as an Inner Board
Clearing the error log in the
Loop Controller
Section 1-2
CPU Unit's cycle time
Loop Controller component's
operation cycle
Loop Controller component's
operation cycle
Duplex initialization time
a) 150 s max. + b) 2.1 s max.
Only b) 2.1 s max.
a) 150 s max. + b) 2.1 s max.