80 Integrated Digital Access (IDA) equipment
configuration, it is recommended that, in the expanded mode, the port
addresses for the NT5K75 and NT6D11AE avoid the standard mode range
(0-15) and be numbered in the range 16-159 instead.
Note to installers
Either the DCHI or the NT8D72 PRI /NT5D97AD DDP2 can be installed
first. However, PRI loops must be configured in software before defining
DCHI links.
Before beginning an installation, do the following:
•
•
•
Figure 14 "A typical DASS2 hardware configuration" (page 81)
typical DASS2 hardware configuration.
Copyright © 2007, Nortel Networks
.
Consult the Spares Planning (NN43001-253) document and follow the
instructions.
Bring spares of all cables and boards.
Remember that the link test procedures require a successful 24-hour bit
error-rate test before the link can be used for live system traffic.
Nortel Communication Server 1000
DASS2 Fundamentals
NN43001-571 02.01 Standard
Release 5.5 7 December 2007
illustrates a