Wall Enclosure Rough Opening - kozy heat BAYPORT 36 LE Installation And Operation Manual

Direct vent gas fireplaces
Table of Contents

Advertisement

3.6 Wall Enclosure Rough Opening

WARNING: Provide adequate clearance in front of the fireplace for
barrier removal, component access, gas line installation, service
access, etc.
NOTE: The construction of the fireplace wall enclosure must comply
with local building codes and all clearances as outlined in this manual.
NOTE: Cold air transfer area. The fireplace wall enclosure should be
constructed in a manner to prevent cold air from entering the room
and outside walls should be insulated.
½
" (13mm) TYPICAL
FINISH MATERIAL
Figure 3.3, Framing Dimensions
14 FRAMING
42"
(1067mm)
¼
36
"
(920mm)
15
"
(403mm)*
*INCLUDES ½" (13mm) TYPICAL FINISH
MATERIAL WITH FLUSH MOUNT
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
METAL-FAB VENT SYSTEM: If installing Metal-Fab vent pipe,
adapter #4DDA must be used. If rear venting, increase the
minimum depth for the wall enclosure rough opening by 3-3/4"
(95mm) in order to maintain the required vent pipe clearances.
If masonry (optional) is to be used, prepare the foundation
necessary for the full masonry load.
Nominal 2"x 4" framing used in enclosure framing
SINGLE VERTICAL HEADER
BOARD IS REQUIRED TO
MAINTAIN CLEARANCES TO
COMBUSTIBLES
#BAY-36-LE & MV R.11 April 2021

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bayport 36 mvBay-36-leBay-36-mv

Table of Contents