System Configuration - Daikin SUPER MULTI NX G Series Service Manual

Table of Contents

Advertisement

System Configuration

1. System Configuration

After installation and test operation of the room air conditioner are completed, the air conditioner
should be handled and operated as described the following pages. Every user should be informed
on the correct method of operation and how to check if it can cool (or heat) well and how to use it
most efficiently.
Providing instructions to the user can reduce requests for servicing by 80%. However proficient the
installation and operating functions of the AC system are, the customer may blame either the room
air conditioner or its installation work because of improper handling. The installation work and the
handing over of the unit can only be considered completed when its handling has been fully
explained to the user without using technical terms while imparting full knowledge of the equipment.
63
SiUS12-928_A
Operation Manual

Advertisement

Table of Contents
loading

Table of Contents