CR 30-X
Starting CR 30-X
Make sure the CR 30-X is connected to the Control PC and that the Control PC is
1
running the appropriate NX Software.
For more information, refer to the NX User Manual.
Press the main switch.
2
The machine starts the following operation sequence:
•
initialization of all components,
•
functional test of all components,
•
check for presence of cassettes and/or IPs,
•
establish connection to the Control PC.
During the self-test, which may take up to 60 seconds, the CR 30-X status indicator is
flashing red.
If the CR 30-X has completed the self-test successfully, the CR 30-X enters the operator
mode and the status indicator is continuously lighting up in green.
32
Getting Started with the CR 30-X
Note: During the self-test, you cannot activate any functions.
Main switch
2386B EN 20060926