Salicru EQUINOX EQX2-4002-T Quick Manual page 45

Zero feed-in and 24h monitoring (optional) solar inverters

Advertisement

Available languages

Available languages

Connect the current transformers.
2.
The voltage is read directly, while the intensity is measured by the external current transformers.
The current transformers are hard-wired. They must be fitted to the L1, L2 and L3 phase cables, just after the IGA, with the arrow pointing
in the direction in which the current flows through the installation when power is fed into the grid: from the loads to the supply.
MAINS
Pin
Pin CT
5
6
7
8
9
10
Power cables not supplied: 0.3 m of network cable (L1, L2, L3, N) with 1.5 mm
4.3. COMMUNICATION BETWEEN THE DEVICES.
The three devices (Network Analyser ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2, Communication Module 485/WIFI 24H
EQX2-T and Solar Inverter EQUINOX2) have to be connected to one another to monitor the energy consumed, generated and
exported to and imported from the grid so that the data obtained can be displayed in the EQX-sun application.
Necessary material
not
supplied:
QUICK GUIDE
P2
P1
L3
Code cables
S1
Cable L1
IMPORTANT: maintain the
S2
phase order L1, L2, L3
S1
Cable L2
S2
S1
Cable L3
S2
POWER CONSUMPTION
L2
L1
cross-section.
2
45
EQUINOX - PHOTOVOLTAIC INVERTERS -