Salicru EQUINOX EQX2-4002-T Quick Manual page 41

Zero feed-in and 24h monitoring (optional) solar inverters

Advertisement

Available languages

Available languages

2. CONSIDERATIONS.
This quick guide is intended to assist both professional installers and users less familiar with the sector when installing the optional devices.
As such, the steps to be followed at each stage of the installation process are described in detail.
However, if additional support is required after following the guidelines in this quick guide, our technical service can be contacted by any of the
means listed on its back cover.
Installing the optional accessories requires modifications to the electrical installations of the switchboard. The following safety warnings must
be observed:
Fig. 1. Pre-installation warnings.
Caution: Ensure the installation's automatic master circuit breaker (IGA) cuts off the power supply to the entire installation.
Make sure the inverter's isolator switch is in the OFF position.
Make sure the protection systems in the junction box are activated and that there is no voltage in the cables you are going to handle.
Due to possible improvement updates, both in this guide and in the application, there may be changes to the explanations and images provided.
As a result, we recommend you download the latest version from our website.
To give you a general idea of the process to be followed, by the end of the installation, you will have carried out the following steps:
Physically insert the measurement and communications devices into the current installation.
Connect the power supply to the measurement and communications devices.
Connect the communications cables between the devices.
Configure the "EQX2-T 485/WIFI 24H communication module" using the EQX-sun APP and register the installation to monitor photovoltaic
generation, grid feed-in/consumption and the consumption of the installation.
QUICK GUIDE
41