Download Print this page

Salicru EQUINOX EQX2-4002-T Quick Manual page 44

Zero feed-in and 24h monitoring (optional) solar inverters

Advertisement

Available languages

Available languages

This section covers the process of electrically connecting the new devices in the protection board of the existing installation.
Material required:
The current transformers (CTs) are hard-wired to the meter.
4.2. POWER SUPPLY TO THE DEVICES.
The ESM3T EQX2 network analyser constantly records the energy consumed from or fed into the grid, working much like a
standard electricity meter. The 485/WIFI 24H EQX2-T communication module transmits the data provided by the ESM3T 90D24
EQX2 / ESM3T 300D50 EQX2 network analyser and the EQUINOX2 solar inverter so that it can be displayed in the EQX-sun application.
Connect power to the ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2 network analyser and the 485/WiFi 24H EQX2-T communication
1.
module.
The ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2 network analyser is the first device to be installed after the IGA, followed by the 485/
WIFI 24H EQX2-T communications module. Connect as shown in the illustration below:
Very important:
Maintain the
phase order.
Power cables
not
0.30  m of network
cable (L1, L2, L3, N) with
1.5 mm
cross-section.
2
L1
L2
L3
N
44
Pin
Code cables
1
Cable L1
2
Cable L2
3
Cable L3
4
Cable N
supplied:
IGA
ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2
ICP
2
Communication module
485/WIFI 24H EQX2-T
Network analyser
Caution:
Fragile
connector,
maximum torque
0.1 Nm.
PIAs
ID
SALICRU

Advertisement

loading