ICPDAS DL-100-E User Manual page 14

Illumination/temperature/humidity/dew point data logger
Table of Contents

Advertisement

Step 1: Feed the end of the two core power cable through the Sealing nut, Seal,
Clamp Ring, Gasket and Lock Nut
Sealing Nut
Step 2: Insert the conductors into the holes on the 5 Pin Cable Connector. See the
figure below for the correct pin-out connections
Step 3: Wrap the Lock Nut around the 5 Pin Cable Connector
DL-100-E / DL-101-E / DL-110-E / DL-120-E User Manual
Seal
Clamp Ring
Gasket
Lock Nut
5 Pin Cable Connector
Version 1.1.3 Dec 2020 - 14 -
Serial Cable

Advertisement

Table of Contents
loading

Related Products for ICPDAS DL-100-E

This manual is also suitable for:

Dl-101-eDl-110-eDl-120-e

Table of Contents