17
1003680-US-4.0
• Measure / Adjust Speeds – Measure to ANSI/BHMA A156.19 and local codes;
adjust if necessary.
• Measure / Adjust Forces – Measure to ANSI/BHMA A156.19 and local codes;
adjust if necessary.
• Measure / Adjust Time Delays – Measure to ANSI/BHMA A156.19 and adjust if
necessary.
• Check Functioning – Mats, Sensors, Operator/Control, and Push Plates per device
checklist and AAADM.
• Check Signage – Are all signs in place, readable, and in good condition?
• Check Door Hinging / Mechanical Soundness – all attachments, covers, arms,
crash bars, etc.
• Check Finger Guards, Glass and Glass Stops, Trip Hazards, Rails and Sharp
Edges.
• Check Emergency Egress (if so equipped).
• Check all wiring for good connections, proper insulation and clearance from
moving parts.
• Go through Daily Safety Checklist with facility manager.
Issue 2007-10-11

Planned maintenance checklist

Planned maintenance checklist
49