Remote Services Broadband Pre-Installation Requirements For Europe - GE Optima XR642 Pre-Installation

Table of Contents

Advertisement

GE Healthcare
Direction 5743854-1EN, Revision 1
1.3

Remote Services Broadband Pre-Installation Requirements for Europe

• To enable an easier installation and to benefit from remote support (service and engineering teams), equipment should
be Insite connected at installation.
• Thus the connectivity solution to implement should be decided during pre installation and all related data should be
available before installation starts.
• For all installations make sure that you have at least one RJ45 dedicated to connect the new equipment on the LAN.
In case of Broadband, this connection will also be used for the remote service of the equipment.
• GE Healthcare offers a wide range of connectivity solutions: From full GE package (GE supplies Router and customer
buys the line) to customized solutions (GE adapts to customer infrastructure).
• Network devices (like CISCO Routers for instance) can be shipped with the equipment only if the Sales Representative
has added the connectivity item in the order.
• For complete descriptions of these connectivity solutions, please refer to the Broadband Solutions catalogue available
through your local GEHC sales and service representative.
• Connectivity Process and pre-installations checklists are available in the Broadband Connectivity Pre-Installation
Manual (PIM) available through your local GE Healthcare sales and service representative.
• For each solution selected by the customer the pre-installation checklist must be fulfilled by site IT manager in order
to get connectivity information (site IT manager contacts, IP address...) available at installation.
Connection of the product to a network that includes other equipment could result in previously unidentified risks to
patients, operators or third parties;
The responsible organization should identify, analyze, evaluate and control these risks;
Subsequent changes to the network could introduce new risk and require additional analysis; and
-
Changes to the network include;
-
Changes in network configuration;
-
Connection of additional items to the network;
-
Disconnecting items from the network;
-
Update of equipment connected to the network;
-
Upgrade of equipment connected to the network.
Page 110
Section 1.0 - Hospital Network
Optima XR642/XR648 Pre-Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima xr648

Table of Contents