Assembly After Maintenance - REMEHA Gas 210 Ace 80 Service Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 210 Ace 80:
Table of Contents

Advertisement

7.4.7

Assembly after maintenance

Fig.64
Mounting the burner
2
4
Fig.65
Mounting the fan and venturi
5.1
5.3
Fig.66
Fitting the electrical connections
7
7
7837115 - v.01 - 10012023
1. Mount the burner.
1
2. Place a new burner gasket.
3. Mount the adapter.
4. Mount the new ionisation/ignition electrode.
3
AD-3002490-01
5. Mount the fan and venturi assembly:
5.1
5.4
AD-3002491-01
6. Mount the air inlet silencer to the venturi.
7. Connect the electrical connections to the fan.
6
AD-3002492-01
3- to 4-section boilers
The burner has one slot at the front. Position this over the pin at the
burner opening.
5.1. Place the new gaskets.
5.2. Mount the assembly.
5.3. Tighten the nuts on the fan output.
5.4. Tighten the nut under the gas control valve.
7 Maintenance
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 210 ace 120Gas 210 ace 160Gas 210 ace 200

Table of Contents