Maintenance; Maintenance Regulations - REMEHA Gas 210 Ace 80 Service Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 210 Ace 80:
Table of Contents

Advertisement

Code
Display text
204
Init safety unit
205
Init blocking
254
StateUnknown
255
SuOutOfResetsWait1Hr
7

Maintenance

7.1

Maintenance regulations

7837115 - v.01 - 10012023
Explanation
The safety unit is initialising.
The blocking is initialising.
The sub state is undefined.
The safety unit is blocking due to too many resets. Wait for 60 minutes or
turn the power off and on again.
Important
The boiler must be maintained by a qualified installer in
accordance with local and national regulations.
Important
An annual inspection is mandatory.
Perform the standard checking and maintenance procedures once a
year.
Perform the specific maintenance procedures if necessary.
Important
Adjust the frequency of inspection and service to the conditions of
use. This applies especially if the boiler is:
In constant use (for specific processes).
Used with a low supply temperature.
Used with a high ΔT.
Caution
Replace defective or worn parts with original spare parts. Not
doing so will void warranty.
During inspection and maintenance work, always replace all
gaskets on the parts removed.
Check whether all gaskets have been positioned properly
(absolutely flat in the appropriate groove means they are gas,
air and water tight).
During the inspection and maintenance work, water (drops,
splashes) must never come into contact with the electrical parts.
Warning
Always wear safety goggles and a dust mask during cleaning work
(involving compressed air).
Danger of electric shock
Ensure that the boiler is switched off.
7 Maintenance
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 210 ace 120Gas 210 ace 160Gas 210 ace 200

Table of Contents