Mounting And Installation Of The Base - Pylontech Force-L2 Operation Manual

Lithium-ion phosphate energy storage system
Hide thumbs Also See for Force-L2:
Table of Contents

Advertisement

3.4.4 Mounting and installation of the base

The base must be fixed installed on the basement with 4pcs M8×80 foundation bolts.
Battery rack basement holes bitmap (unit: mm):
15 / 31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

48v148ah48v222ah48v296ah

Table of Contents