Failure
Failure
Type
Definition
Comm.
BMU
and
Internal
hardware
bus error
(Bit18)
hardware
Current IC
Error
(Bit22)
hardware
Pre-charge
error.
(Bit23)
5.2. Replacement of main component among the BESS
Danger: The PowerCube-X1/X2-V2 is a high voltage DC system,
operated by qualified and authorized person only.
Danger: Before replace the main component must shut off
the maintenance battery string's power. Must confirm the
D+ and D- terminal are without power. The turn off progress
refer to chapter 3.8
5.2.1. Replacement of Battery module
5.2.1.1 Use a charger to charge the new battery module and existing
module to full (SOC 100%)
5.2.1.2 Turn off the whole battery string's power. Must confirm the
D+ and D- terminal are without power. The turn off progress refer
Possible Reason
BMU internal error
current
measurement board
error
Pre-charge circuit
error.
41
If BMS and MBMS is
communication via CANBUS (no
Ethernet switch), make sure
the CANBUS physical length is
less than 12m. Restart the
system.
3. Reverse sequence connect
the comm. cable between the
BMSs and change the ADD
address settings. Restart the
system.
4. Change the BMS CMU or BMS.
5. If problem remain, contact
Pylontech service engineer.
Solution
1.Change the BMU of the RED
LED module.
2.If problem remain, contact
Pylontech service engineer.
1. Restart
2. Change the current
measurement board
3. Change the CMU or BMS.
4. If problem remain, contact
Pylontech service engineer.
1.
Check
the
external
cables
of
the
connection
2.
Change the pre-charge
circuit board
3. If problem remain, contact
Pylontech service engineer.
power
polarity
and