Pylontech PowerCube-X1-V2 Operation Manual page 41

Lithium-ion phosphate energy storage system
Table of Contents

Advertisement

(1) Soft-off the PCS through PCS's control panel.
(2) Turn off the switch between PCS and battery strings (PowerCube-
X1/X2-V2), or turn off the power switch of PCS, to make sure no
current transmission through battery strings and PCS.
(3) Turn off the "Power Switch" of all the BMS.
Caution: Before change the battery module for service,
must charge/discharge the replaced battery to same voltage
as the other modules in the system. Otherwise system needs
long time to do the balance for such replacement module.
Warning: Do not turn off the "Power Switch" during normal
running
string current surge by another battery strings. If turned
off the "Power Switch" in normal running condition, must
first turn off the PCS.
Note
After installation, DO NOT forget to register online for full
warranty:
www.pylontech.com.cn/service/support
condition.
Otherwise
36
will
cause
this
battery

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerCube-X1-V2 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Powercube-x2-v2

Table of Contents