Fig. 11 Installation On The Mounting Rail - Beckhoff EL1918 Operation Manual

Twinsafe terminal with 8 digital fail-safe inputs
Hide thumbs Also See for EL1918:
Table of Contents

Advertisement

5.2.3.6
Installation on mounting rails
Risk of electric shock and damage of device!
Bring the bus terminal system into a safe, powered down state before starting installation, disassembly or
wiring of the Bus Terminals!
Mounting
Fig. 11: Installation on the mounting rail
The Bus Couplers and Bus Terminals are attached to commercially available 35 mm mounting rails (DIN rail
according to EN 60715) by applying slight pressure:
1. First attach the Fieldbus Coupler to the mounting rail.
2. The Bus Terminals are now attached on the right-hand side of the Fieldbus Coupler. Join the
components with slot and key and push the terminals against the mounting rail, until the lock clicks
onto the mounting rail.
If the terminals are clipped onto the mounting rail first and then pushed together without slot and key,
the connection will not be operational! When correctly assembled, no significant gap should be visible
between the housings.
Fastening of mounting rails
The locking mechanism of the terminals and couplers protrudes into the profile of the mounting rail.
When installing the components, make sure that the locking mechanism doesn't come into conflict
with the fixing bolts of the mounting rail. For fastening mounting rails with a height of 7.5 mm under
the terminals and couplers, use flat fastening components such as countersunk head screws or
blind rivets.
EL1918 and EL1918-2200
WARNING
Version: 2.0.0
Operation
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

El1918-2200

Table of Contents