Figure 7 2U Enclosure Outer Rail Components - Seagate Exos E 2U12 Series Hardware Installation And Maintenance Manual

Hide thumbs Also See for Exos E 2U12 Series:
Table of Contents

Advertisement

To install the 2U rackmount rail kit:
1. Remove both outer rail assemblies from their packaging.
1
2. Orient the outer rail with the LH FRONT embossed on it to your left, the other with the RH FRONT embossed on it to your
right, and each emboss toward you, facing inward.
3. Loosen, but do not remove, the 2 set screws on each outer rail with a Philips screwdriver.
4. Facing the left side of the rack cabinet, slide the left front mount bracket pins into holes in the front rack post.
5. Bias the left rack mount bracket as far inward as possible, then verify the entirety of the lower rail tab is visible just beyond
the inner edge of the front rack mount bracket. This step is crucial to safety and proper 2U enclosure operation.
6. Hold the biased mount bracket in that position.
7. Insert a Phillips-head M5 x 15 screw into the center hole of the front mount bracket and barely tighten against the front
rack post using a Philips screwdriver or 8mm nut driver.
2
Item Description
1
Left front mount bracket
2
Left front outer rail
3
Left rail slides

Figure 7 2U enclosure outer rail components

3
4
Item
Description
4
Set screw, front
5
Set screw, rear
6
Left rear mount bracket
Chapter 4   Installation of 2U enclosures
5
6
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exos e 2u24 seriesExos 5u84 series

Table of Contents