Figure 21 Secure Chassis Operator's Panel To Rack Posts; Figure 22 5U Rear Chassis Connection To Outer Rails, Detail, Minus Rear Components For Clarity - Seagate Exos E 2U12 Series Hardware Installation And Maintenance Manual

Hide thumbs Also See for Exos E 2U12 Series:
Table of Contents

Advertisement

Figure 21 Secure chassis operator's panel to rack posts

d. Slide the ops panel cover over the left rack ear flange until flush with the rack post.
e. Repeat the process for securing the right rack ear flange and replacing the right rack ear cover.
f. Facing the rear of the enclosure, insert and tighten an Panhead M5 x 8 screw through the chassis and into the tail of
each outer rail with a Phillips screwdriver to secure the rear of the chassis.

Figure 22 5U rear chassis connection to outer rails, detail, minus rear components for clarity

Chapter 5   Installation of 5U enclosures
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exos e 2u24 seriesExos 5u84 series

Table of Contents