3 Initial install preparations

Each expansion enclosure installation requires the same amount of preparation to successfully mount it into your industry-
standard rack cabinet of up to 1.2m in depth.
WARNING! Heed all warnings and cautions on labeling and throughout this guide to reduce risk of personal injury or
damage to equipment. You must adhere to all safety requirements in this document. Some relate to the entire system, some to
the rack, some to the storage or expansion enclosure, and others to the FRUs within it.
CAUTION Use only power cords supplied in the installation kit or those that meet product specifications.
IMPORTANT Only a qualified service technician should perform the installation.

Installation checklist

Read this entire section before you begin. You must adhere to all safety requirements prior to and during installation.
WARNING! Do not attempt to install the 5U expansion enclosure into the rack cabinet with drive modules preloaded in
the slots. Serious injury and damage could result. Unload any drive modules in enclosure slots to a static-protected area. Do
not further lighten the enclosure by removing other components.
Use this checklist, performing each task only in the sequence presented after successful completion of the prior step.

Table 2 Installation checklist tasks

Step Task
1
Complete all installation prerequisites
2
Unpack the enclosure
3
Prepare the site for installation of the enclosure into the rack
cabinet
4
For rackmount installation, temporarily move any drive modules not installed in the enclosure to a static-protected area
5
Install the rackmount kit in the rack cabinet
6
Mount the enclosure into the rack cabinet
7
Install drive modules in carriers (DDICs) in the enclosure
8
(Optional) Install any additional expansion enclosures
9
Test for safety electrical earth connection
10
Connect all host and any expansion data cables
11
Connect all power cords
18            Chapter 3   Initial install preparations
Reference
Identified below
"Unpack and prepare the 2U enclosure" on page  21
"Unpack and prepare the 5U enclosure" on page  32
"Unpack and prepare the 2U enclosure" on page  21
"Unpack and prepare the 5U enclosure" on page  32
"Install the 2U rackmount rail kit" on page  22
"Install the 5U rackmount rail kit" on page  33
"Mount the 2U enclosure into the rack cabinet" on page  25
"Mount the 5U enclosure into the rack cabinet" on page  37
"Populate the 2U enclosure" on page  27
"Populate the 5U enclosure" on page  41
Follow same process for chassis installation up to this step
"Test enclosure electrical earth connection" on page  42
"Route 2U enclosure data cables and power cords" on page  28
"Route 5U enclosure data cables and power cords" on page  42

Advertisement