Lyve Rack R1 Installation Guide

Figure 3: Mounting the system into a rack (only left rail is shown for clarity)

Figure 3 shows left rail kit placed in a rack in an alignment with its various fasteners, along with 5U84
enclosure and its front locking bracket. For clarity, we have not shown the entire 5U84 enclosure in
the figure.
Complete left rail kit can be seen at the center of this figure. Whereas, top left and bottom right
portion of the figure shows the front and rear of the central left rail illustration from a different angle.
Top left of the figure shows rear rack post along with partially visible left back rail and rear right
portion of the storage enclosure.
Bottom right of the figure shows front rack post along with partially visible left front rail and front left
potion of the storage enclosure along with the Locking bracket.
Two Clamping screws (B) at the back and one Clamping screw (B) at the front are used to fix the rail
kit with the rack post. Whereas, two Enclosure Fastening screws (A) at the front and one Rear
Enclosure Fastening screw (C) at the back are used to fix the 5U84 enclosure with the rail kit at the
front and the back, respectively.