Installation and Start-up

7.
INSTALLATION AND START-UP
7.1.

Safety instructions

DANGER!
Risk of injury from high pressure in the equipment!
• Before loosening the lines and valves, turn off the pressure and vent the lines.
Danger from escaping operating fluid!
If contact is made with the operating fluid and its reaction products, including in vapor form (touching,
inhaling), there is an acute risk of injury.
• Observe applicable accident prevention and safety regulations for the operating fluids used.
Risk of injury due to electrical shock!
• Before removing covers, switch off the power supply and secure to prevent reactivation!
• Observe applicable accident prevention and safety regulations for electrical equipment!
WARNING!
Risk of injury from improper installation or improper start-up!
• Installation and start-up may be carried out by authorized technicians only and with the appropriate
tools!
Risk of injury from unintentional activation of the system and an uncontrolled restart!
• Secure system from unintentional activation.
• Following installation, ensure a controlled restart.
7.2.

Procedures prior to installation

Before installing the LFC / LFM, remove dirt from the pipes and fluid system components.
Connect a suitable filter (≤ 20 µm mesh size) upstream to ensure that the operating fluid is kept clean.
NOTE!
During installation observe the following!
• The mounting position according to calibration plate or calibration protocol.
• The use of a power supply unit with adequate power.
• The maximum permitted residual ripple of the operating voltage.