3.1.2
Required material and tools
Tool
3.2
Assembly
3.2.1
Insert cartridge valve
Visign for Public equipment set
The following tools are required for mounting:
Flat-blade screwdriver
n
Torx screwdriver (T 10)
n
Fork spanner (size 17)
n
Fork spanner (size 32)
n
Requirements:
the pre-wall element has been mounted
n
the revision opening is freely accessible
n
the tiling work is completed.
n
▶
Open the shut-off with a screw driver for a few seconds to rinse the
pipeline.
▶
Re-close shut-off.
▶
Remove seal (SW 17).
Handling
13