Table of Contents

Advertisement

Post Mounting Option

TIP:
The operator is equipped for post mount applications and is ready for installation.
You will only need to supply the posts and U-Bolts.
1.
Consult the local building codes for the depth and concrete requirements.
2. Maximum 3.00" OD pipe.
3. Provide a suf ficient number of conduit pathways for all low power acces-
sories such as loop detector leads, maglock, non-contact sensors, contact
sensors, safety and other commands. Also provide conduit for the power
supply to the operator.
!
DO NOT run low voltage and high voltage wiring in the same conduit.
!
Provide at least 12 " separation between low and high voltage conduits.
15⅞"
with 2-½" IPS Pipe
3" O.D. Pipe
(2⅞" OD)
(Maximum)
VIKING TECHNICAL SUPPORT 1.800.908.0884
GATE OPERATOR INSTALLATION
Top of Pipe
7¾"
Grade Level
Consult Local Codes
for Depth and Concrete
Requirements
Gate
5¾"
16"
(Reference)
4"
Minimum
1 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents