Huawei FusionServer Pro 2288X V5 User Manual page 81

Hide thumbs Also See for FusionServer Pro 2288X V5:
Table of Contents

Advertisement

FusionServer Pro 2288X V5 Server
User Guide
Procedure
Step 1 Install floating nuts.
1.
2.
3.
Issue 04 (2020-06-05)
Determine the installation positions of the floating nuts according to the
cabinet device installation plan.
Figure 7-3 Spacing of 1U on a mounting bar of a cabinet
– Floating nuts are used to tighten screws.
– The boundary between Us is used as the reference for calculating device
installation space.
Fasten the lower end of a floating nut to the target square hole in a
mounting bar at the front of the cabinet.
Use a floating nut hook to pull the upper end of the floating nut, and fasten
it to the upper edge of the square hole.
Copyright © Huawei Technologies Co., Ltd.
7 Installation and Configuration
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents