FusionServer Pro 2288X V5 Server
User Guide
7.2.5.2 Installing the Server on the Ball Bearing Rail Kit
Before installing the server, ensure that the ball bearing rail kit is properly
installed. For details, see
Procedure
Step 1 Install the server.
At least two people are required to move the device. Otherwise, personal injury or
device damage may occur.
1.
2.
Issue 04 (2020-06-05)
NO TICE
Pull out the inner rails as far as they will go.
Figure 7-9 Pulling out an inner rail
Lift the server (at least two people are required), align the two mounting
screws on the rear part of the server with the holes on the inner rails, and
push the server horizontally until the server cannot move. See
Copyright © Huawei Technologies Co., Ltd.
7.2.4.3 Installing the Ball Bearing Rail
7 Installation and Configuration
Kit.
Figure
7-10.
79