FusionServer Pro 2288X V5 Server
User Guide

7.2.4.2 Installing the Static Rail Kit

The static rail kit applies to cabinets with a distance of 543.5 mm to 848.5 mm
(21.40 in. to 33.41 in.) between the front and rear mounting bars.
The 2288X V5 servers are stackable onto the static rail kit.
Procedure
Step 1 Place the rail horizontally in the planned position. Stretch the rail on both sides of
the cabinet based on the cabinet length, keeping it in contact with the mounting
bar in the cabinet, and hook the rail. See (1) in
Step 2 Plug the second square holes at the front and rear of the rail. See (2) in
7-6.
Step 3 On the first lower square hole at the rear of the rail, insert an M6 screw. See (3) in
Figure
Figure 7-6 Installing a static rail
Step 4 Install the other rail in the same way.
----End
Issue 04 (2020-06-05)
The distance between the three holes in each mounting bar for the guide rail must be
within 1 U.
7-6.
Although the static rail kit does not need screws for installation, you can perform this
operation to improve the shockproof level and fastening degree of the server.
Copyright © Huawei Technologies Co., Ltd.
7 Installation and Configuration
Figure
7-6.
Figure
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents