Moto Z (Droid) / Moto Z
Level 2 – Service and Repair Manual
MSM Shield and Copper Tape Assembly
Description
ASSY,PWA,MN,BD KIT, SHERIDAN,ROW
ASSY,PWA,MN,BD KIT, SHERIDAN, VZW,64GB
ASSY,PWA,MN,BD KIT, SHERIDAN,ROW, 64GB
ASSY,PWA,MN,BD KIT,SHERIDAN,CHINA
ASSY,PWA,MN,BD KIT, SHERIDAN-64GB,ROW (JAG)
ASSY,PWA,MN,BD KIT, SHERIDAN, 32GB-NA
ASSY,SHLD,UBER, SHERIDAN
DIE CUT,COP TAPE, SHERIDAN
1.
Place the PCB into the Sheridan PCB Assembly
Alignment Fixture (3-00-J5-10000), using the
pins in the Fixture to align it.
2.
Place the MSM Shield over the bottom of the
PCB, aligning it to the snaps.
3.
Press down on the MSM Shield until it snaps into
place.
PAGE 79
Reference #
2
20
14
Motorola Mobility Confidential Restricted:
Do not share without consent from Motorola