ALLIANCE 030 Series Installation Manual page 78

Table of Contents

Advertisement

Steam Requirements
1
7
NOTE: Refer to Table 33 for sizing of steam lines. Piping must also be sized accordingly for length of runs and
number of elbows.
1. Steam Coil
2. 12 in. [300 mm] Riser
3. Condensate Return Line from Supply Line
4. Shut-Off Valve
5. Check Valve
6. Trap with Built-In Strainer
7. Vacuum Breaker (Optional)
8. 18 in. [460 mm] Drop Recommended (not above outlet)
9. Solenoid Valve (Supplied with machine)
10. Union
11. Return
12. Supply
©
Published by permission of the copyright owner -
DO NOT COPY or TRANSMIT
9
8
5
10
Figure 23
12
2
4
10
5
4
6
78
3
11
TMB2646N_SVG
Part No. 70686701ENR4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

035 series055 seriesT30 seriesT45 seriesBa030eBt030n ... Show all

Table of Contents