  • Page 1 UPS2000-H-(6 kVA-10 kVA) Quick Guide Issue Date 2023-08-20 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    This document is intended for: ● Technical support engineers ● Hardware installation engineers ● Commissioning engineers Symbol Conventions The symbols that may be found in this document are defined as follows. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 4 ● Added information about cloud access through FE. ● Added information about installing guide rails. 2023-04-20 Deleted the content related to lithium batteries. 2022-06-30 This issue is the first official release. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    1.3.2.1 Installing the UPSs and Lead-Acid Batteries......................27 1.3.3 Installing Cables................................. 29 1.3.3.1 Cable Routes..................................30 1.3.3.2 Installing AC Power Cables............................31 1.3.3.3 Installing Lead-Acid Battery Cables......................... 34 1.3.3.3.1 Installing Power Cables for Lead-Acid Batteries....................34 Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 2.2.2.1 Power-On..................................59 2.2.2.2 Starting the Inverters..............................60 2.2.2.3 Powering On Loads............................... 64 2.2.2.4 Shutting Down the UPS............................... 64 2.2.2.5 Cold-Starting the UPS Using Batteries........................66 2.2.2.6 Performing EPO................................66 Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7: Installation And Cable Connection

    UPS is less than or equal to 50 mA. After the UPS is installed, the leakage current of the system may be greater than 300 mA (250 mA + 50 mA). In this case, the upstream circuit breaker will trip for protection. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8: Site Planning

    Clearances of at least 500 mm should be reserved in front of and behind the chassis. Figure 1-1 Clearances for the 6 kVA model (unit: mm) Figure 1-2 Clearances for the 10 kVA model (unit: mm) Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9: Tools

    Hardware installation tools Flat-head Phillips insulated Utility knife Marker insulated torque torque screwdriver screwdriver (2 mm) (M4/M6) Cable installation tools Wire stripper RJ45 crimping Electro-hydraulic Heat gun tool pliers Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10 Diagonal pliers Crimping tool Hydraulic pliers crimping tool Cable cutter Measurement instruments Clamp meter Multimeter Network tester Engineering auxiliary materials Label Cable tie Cotton cloth Heat-shrink tubing Insulation tape Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11: Materials

    When the external conditions such as cable routing or ambient temperature change, perform verification in accordance with the IEC 60364-5-52 or local regulations. ● Cable type: copper flexible cable whose conductor supports the maximum operating temperature of 90°C Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12 144 V DC 50 A/2 P OT-10 2 x 4 mm (lead- Battery+/ to 240 V (characteris acid BAT-/ DC (12–20 tic D) M4-90° battery) Battery-/PE PCS of 12 bending batteries) Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13 (lead- Battery + to 240 V (characteri M6-90° acid DC (12–20 stic D) bending battery) PCS of 12 BATTERY/ 2 x 6 OT-16 mm Battery – M6-90° batteries) bending Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 AC/230 V (characteri M6-90° output SL AC/240 V stic C) bending 16 mm OT-16 mm OUTPUT/AC M6-90° output PL bending 16 mm OT-16 mm OUTPUT/AC M6-90° output N bending Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15: Unpacking And Checking

    ● Use power cables made of soft conductors that work at 90°C or even softer conductors. If you use power cables made of solid conductors or twisted conductors, the cables may fail to be connected. 1.1.5 Unpacking and Checking Context Figure 1-3 Transportation rules Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16: Installing A Single Ups

    1.2 Installing a Single UPS 1.2.1 Rack-Mounted Installation 1.2.1.1 Installing the UPS and Lead-Acid Batteries Procedure Step 1 Install mounting ears on both sides of the UPS. Figure 1-4 Installing UPS mounting ears Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17 Step 3 Take out the guide rails from the fittings and install them on the rack. Figure 1-6 Installing the guide rails Step 4 Install the UPS and batteries with mounting ears on the rack, and then install the battery front panels. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18: Tower-Mounted Installation

    1.2.2.1 Installing the UPS and Lead-Acid Batteries Procedure Step 1 Assemble the support bases. Figure 1-8 Assembling a support base Step 2 Place the UPS and batteries on the support bases. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19 For tower-mounted installation, you are advised to place batteries on the left side of the UPSs, as shown in the figure. Step 3 Install rubber plugs. Figure 1-10 Installing rubber plugs ----End Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20: Installing Cables

    ● Install battery cables in the following sequence: 1. Install cables at the battery terminals on the UPS side. 2. Install cables at the battery terminals on the battery side. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21 1 Installation and Cable Connection Cable Routes for the UPSs and Lead-Acid Batteries Figure 1-11 Cable routes for a single UPS (rack-mounted) (1) AC input power cable (2) AC output power cable Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22: Precautions

    ● For a single UPS, connect loads to AC OUTPUT SL and PL terminals. Connect primary loads to the SL terminal and secondary loads to the PL terminal. 1.2.3.3 Installing AC Power Cables (with a PG Connection Box) Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23: Kva

    Figure 1-15 Routing the cable through the gland Step 5 Install AC output power cables and then AC input power cables in sequence. Figure 1-16 Installing AC power cables Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24: Kva

    Figure 1-19 Port baffle plates (1) Port baffle plates Step 1 Switch off the upstream AC circuit breaker for the UPS. Step 2 Remove the top cover from the connection box. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25 Take out a short-circuit copper bar from the fitting bag and short-circuit L1, L2, and L3 using the short-circuit copper bar. Secure the AC power cables to the wiring ports. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26 Figure 1-25 Installing the top cover from the connection box Step 7 Move the top cover of the PG box to the assembly position and tighten the PG connector. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27: Installing Ac Power Cables (Without A Pg Connection Box)

    Step 3 Install AC output power cables and then AC input power cables in sequence. Figure 1-28 Installing AC power cables Step 4 Install the top cover from the connection box. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28: Kva

    Take out a short-circuit copper bar from the fitting bag and short-circuit L1, L2, and L3 using the short-circuit copper bar. Secure the AC power cables to the wiring ports. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29 Three-phase input single-phase output Figure 1-33 Installing AC power cables Step 4 Install the top cover from the connection box. Figure 1-34 Installing the top cover from the connection box ----End Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30: Installing Lead-Acid Battery Cables

    Step 3 Tighten the screws at both ends of the battery terminals. Step 4 Reinstall the covers for the UPS wiring ports. Figure 1-35 Installing battery cables (two battery packs) Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 31: Installing A Parallel System

    Only single-phase and three-phase inputs support parallel connection. 1.3.1 Rack-Mounted Installation 1.3.1.1 Installing the UPSs and Lead-Acid Batteries Procedure Step 1 Install mounting ears on both sides of the UPS. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32 Step 2 Install mounting ears on both sides of the battery. Figure 1-38 Installing battery mounting ears Step 3 Take out the guide rails from the fittings and install them on the rack. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33: Tower-Mounted Installation

    Step 4 Install the UPSs and batteries with mounting ears on the rack, and then install the battery front panels. Figure 1-40 Installing the UPSs and batteries ----End 1.3.2 Tower-Mounted Installation 1.3.2.1 Installing the UPSs and Lead-Acid Batteries Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34 Figure 1-42 Placing the UPSs and batteries NO TE For tower-mounted installation, you are advised to place batteries on the left side of the UPSs, as shown in the figure. Step 3 Install rubber plugs. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35: Installing Cables

    Ensure that there is no dust or scraps around the UPSs. Cables are installed in the same way for the 6 kVA and 10 kVA models. This section uses the 6 kVA model as an example. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36: Cable Routes

    1.3.3.1 Cable Routes Cable Routes for the UPSs and Lead-Acid Batteries Figure 1-44 Cable routes for four parallel UPSs (rack-mounted) (1) AC input power cable (2) AC output power cable Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37: Installing Ac Power Cables

    Step 1 Switch off the upstream AC circuit breaker for the UPS. Step 2 Remove the covers from the UPS wiring ports. Step 3 Install AC output power cables and then AC input power cables in sequence. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38 Quick Guide 1 Installation and Cable Connection Figure 1-46 Connecting single-phase input and single-phase output cables (6 kVA) Figure 1-47 Connecting single-phase input and single-phase output cables (10 kVA) Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39 Quick Guide 1 Installation and Cable Connection Figure 1-48 Connecting three-phase input and single-phase output cables (10 kVA) Figure 1-49 Connecting AC input and output cables (with a PDU) ----End Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40: Installing Lead-Acid Battery Cables

    Step 3 Tighten the two screws at both ends of the battery terminal. Step 4 Reinstall the covers for all UPS wiring ports. Figure 1-50 Two parallel UPSs + four battery packs Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41: Installing Ups Communications Cables

    Quick Guide 1 Installation and Cable Connection Figure 1-51 Four parallel UPSs + four battery packs ----End 1.3.3.3.2 Installing UPS Communications Cables Procedure Step 1 Installing parallel communications cables Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 42: Connecting A Backfeed Protection Device

    Quick Guide 1 Installation and Cable Connection Figure 1-52 Installing communications cables (two parallel UPSs) Figure 1-53 Installing communications cables (four parallel UPSs) ----End 1.4 Connecting a Backfeed Protection Device Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43: Backfeed Protection Device Specifications

    Requirements HONGFA: HF18FF/012 Contact type: normally closed (NC) Breaking capacity: 250 V AC, 5 A OMRON: MY2N-J DC12V Coil specifications: 12 V, rated current Panasonic: HJ2-L-DC12V < 1 A Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44: Feedback Protection Connections (With Dry Contract Control)

    They need to be installed behind the optional card slot cover labeled INTELLISLOT on the rear panel of the UPS. The actual installation position may vary with product models. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45 Step 1 Remove the cover of the optional card slot on the rear panel of the UPS. Figure 1-56 Removing the optional card slot cover NO TE Keep the cover for later use. Step 2 Insert the SNMP card into the slot, and tighten screws. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46 DNS server. Step 7 Set and test domain name parameters. Choose System Settings > NMS Application > BIN > Communication Parameters on the WebUI. Set parameters as follows: Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47: Installing A 4G Module

    SNMP card IP address in the address box of the browser, select a Step 4 Enter https:// language, and enter the correct User Name and Password. The default user name is admin, and the preset password is Changeme. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 48 You can obtain the ESN in either of the following ways: ● Scan the documentation QR code on the device to obtain the ESN. ● Obtain the ESN on the About page of the WebUI. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49: Installing An Rpdu And Rpdu Cables

    – Connect cables to the rPDU based on the type of the rPDU and the silk screen on the wiring port. The following cable connection is for reference only. Figure 1-65 Connection position in horizontal PDU2000-16-1PH-8/0-B1 Figure 1-66 Connection position in vertical PDU2000-63-1PH-16/8-B1 Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50 1 Installation and Cable Connection Figure 1-67 Connecting cables to rPDUs Connect the other end of the power cable to the UPS output port. Figure 1-68 Installing power cables (6 kVA UPS) Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51: Checking The Installation

    Use a multimeter to measure the resistance between the UPS ground cable and the equipment room ground bar. The resistance must be less than 0.1 ohm. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 52 The inside and outside of the cabinet are free from conductive dust or other sundries. Cable short circuits Check that cables are open-circuited using a multimeter or an insulation resistance tester. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53: Power-On Commissioning

    After the UPS is installed, the leakage current of the system may be 250 mA + 100 mA > 300 mA. In this case, the upstream circuit breaker will trip for protection. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54: Lead-Acid Battery

    When the mains is abnormal, the bypass output is disabled. As a result, the UPS SL terminal has no output voltage. ----End 2.2.1.2 Initial Startup 2.2.1.2.1 Installing the App Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55: Logging In To The App

    Step 3 Download and install the app using either of the following methods. ● Download and install the NetEco app using a web browser. ● Download and install the NetEco app from Huawei AppGallery. ----End 2.2.1.2.2 Logging In to the App NO TE ●...
  • Page 56 Manually connect to WLAN Tap Manually connect to WLAN. The Select WLAN network screen is displayed. Select the UPS WiFi name whose last 20 digits are the same as the SN. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57 Figure 2-7 Scanning the UPS QR code Step 5 Enter the user name and password and tap Log In. (The preset user name is admin and the preset password is Changeme.) Figure 2-8 Login screen Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58: Quick Settings

    Set the battery type, single battery voltage, number of batteries in a battery string, single battery capacity, and number of battery strings based on site requirements. Figure 2-10 Quick Settings Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59: Starting The Inverter

    Set the voltage level and frequency level based on site requirements. ● Set the battery type, single battery voltage, number of batteries in a battery string, single battery capacity, and number of battery strings based on site requirements. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 60 UPS2000-H-(6 kVA-10 kVA) Quick Guide 2 Power-On Commissioning Figure 2-11 Quick Settings Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 61 Number of Specifies the number of Set as 1–4. The battery battery strings connected in required. default value strings parallel. This parameter is is 0. configurable in non- battery mode. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 62: Powering On Loads

    ● Method 1: When the UPS works in bypass mode, hold down the button on the UPS panel for more than 5s. Release the button when the inverter Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 63: Cold-Starting The Ups Using Batteries

    Hold down the UPS button for more than 5s, and the UPS enters battery mode. Step 3 When the UPS runs properly, switch on the UPS AC output circuit breaker Q1 to supply power to loads. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 64: Performing Epo

    In this way, the UPS stops supplying power through the output terminals immediately. ● The external EPO switch (switch or dry contact signal controlled by a switch) is provided by the customer. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 65: Parallel System Operations

    Step 2 Switch on the UPS mains AC input circuit breakers K1 and K2, and the general mains AC input circuit breaker K. The parallel system has no output. ----End Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 66: Starting The Inverters

    Specifies the system output Set as 50, 60, and level(Hz) frequency level. This required. automatic. parameter is configurable The default only after the inverter is value is 50. shut down. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 67 0. configurable in non- battery mode. Step 3 The parallel configuration parameters are adaptive. Choose Config > System Parameters > Parallel system to manually set the parameters as required. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 68 1. Step 4 Check that parameters of the current UPS are automatically synchronized to the other UPSs in the parallel system. Figure 2-18 Synchronizing parallel parameters Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 69 Q2 does not exceed 2 V. NO TE If the voltage difference between the two ends of the output circuit breaker Q2 exceeds 2 V, the input or output wire sequence is incorrect. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 70: Powering On Loads

    ● Method 1: When the UPS works in bypass mode, hold down the button on the UPS panel for more than 5s. Release the button when the inverter Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 71 AC input circuit breaker K for the UPS system. Switch off the UPS AC output circuit breakers Q1 and Q2 and the general AC output circuit breaker Q for the UPS Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 72: Cold-Starting The Ups Using Batteries

    Turn on the EPO switch (provided by the customer). The UPS system enters the EPO state. That is, the UPS system shuts down the inverters, and does not transfer to bypass mode. Figure 2-22 EPO cable connection in a parallel system Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 73 In this way, the UPS stops supplying power through the output terminals immediately. ● The external EPO switch (switch or dry contact signal controlled by a switch) is provided by the customer. Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd.