UPS2000-H-(6 kVA–10 kVA)
Quick Guide
Step 4 Install rubber plugs.
Figure 1-12 Installing rubber plugs
----End
1.2.2.2 Installing the UPS and Lead-Acid Batteries
Procedure
Step 1 Assemble the support bases.
Figure 1-13 Assembling a support base
Step 2 Place the UPS and batteries on the support bases.
Issue 01 (2022-06-30)
NO TE
For tower-mounted installation, you are advised to place batteries on the left side of the
UPS.