Page 1
UPS2000-A-(6 kVA-10 kVA) User Manual Issue Date 2019-05-05 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Follow the precautions and special safety instructions provided by Huawei when operating Huawei products. Huawei will not be liable for any consequences that are caused due to violations regarding general safety regulations and equipment design, production, and usage safety standards.
Page 9
Personal Requirements Only Huawei engineers or engineers certified by Huawei are allowed to perform UPS commissioning and maintenance. Otherwise, human injury or equipment damage may occur, and any resulting UPS faults will be beyond warranty scope.
Page 14
1 Safety Precautions To ensure battery safety and efficient battery management, use the batteries delivered with the UPS. Huawei shall not be responsible for battery damage caused by using non-Huawei batteries for Huawei UPSs. Ensure lead-acid battery handling is in accordance with local regulations.
UPS2000-A-(6 kVA-10 kVA) User Manual 2 Overview Figure 2-7 Rear view of the UPS2000-A-6 kVA/10 kVA professional version with long backup time (1) AC input (2) Optional card slot (3) EPO port (4) USB port (security circuit breaker (under the cover)
Page 30
User Manual 3 Installation UPS2000-A-6 kVA/10 kVA Dimensions Figure 3-1 UPS2000-A-6 kVA/10 kVA installation dimensions (Unit: mm) Clearances The distance between UPS air vents and the wall or obstacle is greater than or equal to 500 Reserve a clearance of at least 500 mm respectively from the front and rear panels of the UPS to the wall or adjacent equipment to facilitate ventilation and heat dissipation, as shown in Figure 3-2.
If there is any discrepancy, contact your local Huawei office immediately. Check that the fittings comply with the packing list. If some fittings are missing or do not comply with the packing list, record the information and contact your local Huawei office immediately.
Page 59
4 Control Panel The LCD snapshots in this document correspond to the software version V100. If any LCD changes are made, contact Huawei technical support to obtain the latest snapshots. The information in the menu pictures is for reference only.
Works with NetShutdown, a computer and server security shutdown program developed by Huawei, to automatically shut down the computers and servers where NetShutdown is installed to protect customer data and reduce loss. For details about the SNMP card, see the RMS-SNMP01A V100R002 User Manual.
4. Keep deformed and bulged faulty batteries still for 30 minutes and then check and record open-circuit voltage of the faulty battery. 5. If the fault persists, contact Huawei technical support. 1. The service 1. Identify the cause of the abnormal battery...
4. Keep deformed and bulged faulty batteries still for 30 minutes and then check and record open-circuit voltage of the faulty battery. 5. If the fault persists, contact Huawei technical support. 1. The service 1. Identify the cause of the abnormal battery...