UPS2000-H-(6 kVA–10 kVA)
Quick Guide
Figure 1-5 Installing the UPS and batteries
----End
1.2.1.2 Installing the UPS and Lead-Acid Batteries
Procedure
Step 1 Install mounting ears on both sides of the UPS.
Figure 1-6 Installing UPS mounting ears
Step 2 Install mounting ears on both sides of the battery.
Issue 01 (2022-06-30)
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
12