Huawei UPS2000-H Quick Manual page 27

Hide thumbs Also See for UPS2000-H:
Table of Contents

Advertisement

UPS2000-H-(6 kVA–10 kVA)
Quick Guide
Figure 1-20 Port baffle plates
(1) Port baffle plates
Procedure
Step 1 Switch off the upstream AC circuit breaker for the UPS.
Step 2 Remove the covers from the UPS wiring ports.
Step 3 Install AC output power cables and then AC input power cables in sequence.
Figure 1-21 Installing AC power cables (6 kVA single-phase input single-phase
output)
Issue 01 (2022-06-30)
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
21

Advertisement

Table of Contents
loading

Table of Contents