5. ENGINE REMOVAL/INSTALLATION
SERVICE INFORMATION .......................................................................................................5-1
ENGINE REMOVAL .................................................................................................................5-2
ENGINE INSTALLATION ........................................................................................................5-3
SERVICE INFORMATION
GENERAL INSTRUCTIONS
• A engine stand or floor jack is required to support and maneuver the engine.
• The following parts can be serviced with the engine installed in the frame:
 Cylinder head/valves (Section 6)
 Cylinder/piston (Section 7)
 Starter motor/generator/left crankcase cover/starter clutch/camshaft (Section 8)
 Clutch/gear shift mechanism (Section 9)
• When removing and installing the engine, do not use a hammer or screw driver to strike or pry the
engine.
• Do not damage the crankcase mating surfaces and clean off all gasket materials from the mating
surfaces.
• After crankcase assembly, check that the transmission system operates smoothly.
• After engine installation, start the engine and check that the lubrication system is normal.
Engine oil capacity:
At disassembly : 1.1 liter
At change
TORQUE VALUES
Engine bracket bolt
Drive gear lock bolt
Exhaust muffler hanger lock bolt
Rear fork pivot nut
Exhaust muffler joint lock nut
5-1
: 1.0 liter
2.0~2.5kg-m
0.8~1.2kg-m
2.4~3.0kg-m
5.5~6.5kg-m