Installation Hints; Installation Space Condition - VAT 616 Series Installation, Operating, & Maintenance Instructions

Butterfly control & isolation valve
Table of Contents

Advertisement

4.3.1

Installation Hints

Install valve into the vacuum system. Valve seat side shall face process chamber.
4.3.2

Installation space condition

16/144
INSTALLATION
Do not tighten the flange screws stronger than indicated under chapter «Tightening
torque».
Do not admit higher forces to the valve than indicated under chapter «Admissible
forces».
Make sure that enough space is kept free to do preventive maintenance work. The
required space is indicated on the dimensional drawing.
Control unit of valves with ISO-KF (616 . . – K . . .) needs support when mounted
on horizontal piping and control unit does not hang.
Install the valve with integrated controller with space for dismantling and air
circulation as shown in figure below.
Edition 10.08.2022
70
Sample picture
1143687EA
Series 616

Advertisement

Table of Contents
loading

This manual is also suitable for:

616 gz series616 az series616 hz series616 cz series

Table of Contents