Sinclair S therm Series Service Manual page 118

Split heat pumps
Table of Contents

Advertisement

(2) Adopt M12 bolts components to tighten feet and under frame when installing.
(3) Outdoor unit should be installed on concrete base that is 10cm height.
(4) Requirements on installation space dimension of unit's bodies are shown in following drawing.
(5) Outdoor unit must be lifted by using designated lifting hole. Take care to protect the unit during lift. To avoid
rusting, do not knock the metal parts.
Note: when release and refix the screw of the clasper,should use your hand to support the panal.And then,after
connected power cable,please ensure using the elastic trip of accessory to tighten with the pipe.
4.4.6 Safety operation of flammable refrigerant
Qualification requirement for installation and maintenance man
All the work personnel who are engaging in the refrigeration system should have got the valid certification
awarded by the authoritative organization and the qualification for dealing with the refrigeration system recognized
by this industry.
If it needs other technician to maintain and repair the appliance, they should be supervised by the person who
114
Power cable
Pipe
Insulation
Elastic trip

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents