5 Installation at Site
Three-phase (3~) motors with two power cables for star-delta starting
The six current-carrying conductors of the two power cables are designated U1, V1,
W1 and U2, V2, W2; the earth conductor is marked PE.
The motors are wired for both star and delta operation, as shown on the name plate.
5
L1
L2
4
U1
V1 W1
U1
V1
3
W1
2
3~
1
Fig. 23: Circuit diagram: motors with two power cables for star-delta starting
1
Motor
3
Core marking
5
Line conductor
Set the overcurrent relay for the applicable starting method:
▪ For DOL starting to the operating current or, at most, to nominal current I
▪ For star-delta starting to the operating current or, at most, to the nominal
current x 0.58.
NOTE
Fitting an ammeter is recommended.
UPA / UPA S
L3
W2
U2
V2
2
Motor power cables
4
Control unit
PE
Earth conductor; core marking:
green/yellow
PE
PE
W2
U2
V2
N