Siemens KION Service Manual page 176

Anesthesia workstation
Table of Contents

Advertisement

Maintenance
7
7 - 10
Checking pressure regulator REG 1
• Check and if required adjust the Mushroom valve
control gas supply pressure delivered by REG 1.
The pressure delivered by REG1 should be set to
20 kPa.
For the check and adjustment of REG 1, use to the
tool "Pressure Tester 0.2 bar regulator", P/N 65 62
479. Instructions are enclosed with the tool.
Checking support plate for patient cassette
• Check and if required adjust the level of the patient
cassette support plate.
For this check and adjustment, use the "Support
plate adjustment tool", P/N 66 37 529. Instructions
are enclosed with the tool.
Siemens-Elema AB
KION / KION-i
E382 E392E 061 01 02 02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kion-i

Table of Contents