Venture Products Ventrac SS575 Operator's Manual & Parts Drawings page 21

Salt spreader
Table of Contents

Advertisement

5. Place the frame mount bracket against the inside
of the right leg of the roll bar. Position the bottom
edge of the frame mount bracket 24 -25 inches
from the bottom of the roll bar and install 2)
u-bolts (F) and 4) locking flange nuts (G). Torque
the flange nuts to 31 ft-lbs (42 Nm).
F
6.
Insert the arm (H) of the control box mount into
the frame clamp bracket.
7.
Install the spreader control box bracket onto the
control box mount using 2) #10-32 x 1/2"
machine screws (I) and #10-32 flange nuts.
I
SPREADER SETUP & INSTALL KITS
G
H
I
8. Fully extend the control box mount arm and tighten
the knobs to clamp the control box mount in place.
9. Route the gate cable along the back of the power
unit seat box and up the inside of the right roll bar.
Install the gate control cable (J) and handle onto the
control box mount.
J
10.
Use Velcro ties to fasten
the gate cable to the roll
bar 2-3" above the
power unit fender and to
the power unit seat box.
11.
If gate cable is already mounted to the spreader,
skip to step # 15.
3" and determine the length of cable needed to
reach the gate body. NOTE: before cutting the
cable to length, check to ensure that there is
enough slack in the cable to allow the control
cable to slide freely in the cable housing.
12. Cut off the cable at the desired length and then
push the gate cable handle back into the cable
housing. Slide the brass cable fitting onto the
gate cable and thread onto the cable housing.
13.
Install the cable fitting onto the gate body (K) as
shown.
14. Insert the cable
end into the
gate slide
(L) and
through
the hole in the bolt. Ensure
the gate slide is in the closed
position and tighten the bolt to
secure the gate cable.
Setup - 21
Pull the gate cable handle out
K
K
L
L

Advertisement

Table of Contents
loading

Table of Contents