Venture Products Ventrac SS575 Operator's Manual & Parts Drawings page 17

Salt spreader
Table of Contents

Advertisement

Drill the mounting hole using a 7/32" drill bit,
remove any metal shavings, and use touch up
paint on exposed metal.
5. Install the spreader control box bracket onto the
bottom of the tray using 2) #10-32 x 1/2" machine
screws and #10-32 flange nuts.
6.
Connect the battery/controller wire harness to
the battery lead on the
spreader controller and
connect the motor/controller
wire harness to the motor lead
on the spreader controller.
7. Route the wire harnesses
down along the cab post and
fasten to the gate cable mount
bracket using a Velcro tie (F).
8. Route the wire harnesses
under the foot plate and
hydraulic filter, over the axle
housing, and out the back of
the power unit.
SPREADER SETUP & INSTALL KITS
F
9. Route the gate
path as the wire
harnesses and
install the gate
control cable (G)
and handle onto
the gate cable
mount bracket.
10. Fasten the wire
harnesses and the
gate control cable (if
equipped) underneath the foot plate and to the side
of the lower rear frame tunnel using 2) cushioned
clamps and 1/4" x 3/4" flange bolts and flange nuts.
11. Insert the battery/controller wire harness between
the power unit seat box and canvas window of
the cab and connect to the positive and negative
wires connected to the power unit battery and
fasten to the cab wire harness using a Velcro tie.
12. Connect the harness to the power cord on the
spreader. NOTE: if the power unit is equipped
with a 3 point hitch, route the harness through
the hitch frame under the pivot shaft before con-
necting to the spreader's power cord.
13. Coil the extra wire from the battery/controller and
motor/controller wire harnesses at the back of the
power unit and fasten to the hitch frame upper
Setup - 17
control cable along the same
G

Advertisement

Table of Contents
loading

Table of Contents