Completion Of Installation; Mechanical Connection Of The Control Block/Control Block Segment - Bosch Rexroth SB11 Instruction Manual

Load-sensing control block for mobile applications
Hide thumbs Also See for Rexroth SB11:
Table of Contents

Advertisement

40/60
Load-sensing control block SB11 | Installation
Installation
Bosch Rexroth AG, RE 66177-B/2022-05-03
1� Observe the requirements for the contact surface in the offer drawing.
2� Always fasten the control block/control block segment at all intended
mounting points.
3� Tighten the mounting bolts clockwise using a torque wrench in accordance
with Table 13.
Table 13: Tightening torques
Screw
Tightening torque
M8 – 8.8
20+4 Nm
M8 – 10.9
30+6 Nm
Fig. 3: Control block mounting, example with AP and EVR with mounting bracket
7�6�3 Completion of installation
▶ Remove the transport protection.
If necessary, the control block/control block segment may be delivered
with protective covers and protective plugs. They are not pressure-resistant
and have to be removed prior to connection.
7�6�4 Mechanical connection of the control block/control block segment
Connection of actuation elements including tolerances is illustrated in the offer
drawing. The tightening torques are to be selected according to the actuation
elements. There must not occur any radial forces during actuation!
Minimum screw-in
Through bore diameter Ø
depth of the thread
15 mm
8.3 mm

Advertisement

Table of Contents
loading

Table of Contents