Decommissioning and Disposal

© Landis+Gyr
Issue: 1.8
The procedure for the safe removal of the meter from the installation is
described in section 12.3. Please ensure that ALL SAFETY
PRECAUTIONS are met before proceeding.
Based on the environmental certificate ISO 14001, the components used to
manufacture the meter can, in the main, be broken down into constituent
parts and sent for suitable recycling or disposal.
The following are general guidelines and should NOT take priority over local
disposal and environmental policies which should be adhered to without
compromise.
Component Parts
Printed Circuit Boards
LCD Display
Metal Components
Plastic Components
Decommissioning and Disposal
Disposal
Treated as per disposal of Electronic Equipment
Sorted and delivered to collective recycling point
Sorted and delivered for re-granulation if at all
possible
E470 Tokenless Smart Prepayment Meter